Berlin, New construction of the southeast connection, New construction of the Spree Bridge
Object | Berlin, New construction of the southeast connection, New construction of the Spree Bridge |
Extent | construction survey, hydrographic position finding, control measurements, as-built survey |
Software | Geograf, Card/1 |
Instruments | Tachymeter: Leica 1203, Leica MS 50 Digital level: Leica DNA 03, Trimble DINI 10 |
Detailed service description | • Direction-finding of soles prior to the start of construction, between-bearings during the construction and check dip of the water depth after the end of construction • Primal survey and surveying during construction of the geometry of the building • Survey for hydraulic engineering • Accomplishing settlement measurements of the engineered building, control- and monitoring measurements • Performance of the final survey und production of as-built plans |